2013年9月22日星期日

Concrete pump with vertical piping


Characteristics and should be based on the construction site pouring concrete programs piping, piping design should check whether the distance pipeline horizontal scaling and concrete pump pumping distance adapt. Piping should be possible to shorten the length of the pipeline, less elbow and hose. Pipeline laying pipelines should be easy to clean, concrete batching plant  and disassembly and maintenance. When the new pipe and the old pipe mix, should the new pipe installation at the pumping pressure. Piping process should draw piping diagrams, lists the various pipe fittings, pipe clamp, pipe and hose size and number, etc., and provide a list.
Piping to be straight up, with the increasing height of the potential energy increases, the concrete presence of reflux trends should therefore be concrete pump with vertical piping between a certain length of horizontal pipe laying, to ensure there is enough to stop the resistance of concrete reflux. Bolted Type Cement Silo concrete high-rise building vertically upward piping is required, then it should not be less than the length of the ground level tube vertical tube length is 1/4. As a result of limited space, these requirements can not be placed when the length of the pipe, or hose pipe can be used instead.

没有评论:

发表评论