2014年1月6日星期一

Take all measures to ensure construction quality


In construction , the construction unit to take all measures to ensure construction quality . By the construction of the tunnel Springs control projects across the board , due to the import of venue is limited, do not have the hole conditions can only choose from the outlet end of the hole. The outlet end of the hole dug 10 meters under the roadbed need right close to the children head hydropower diversion canal lock , batch plants for sale cutting edge from less than 3 meters, eight meters above the canal water surface elevation of the roadbed design , there are serious safety risks. Project Department through rigorous and reliable construction organization specialized technical solutions , and strictly follow the " sub- stratified excavation , sub- hopping protection," construction principles , protable concrete mixer effectively solve this problem, ensure the security hole. Just one problem solved, another problem quickly followed , and the problems of construction workers leaving the headache . Tunnel construction needs across 74 meters of shallow gravel soil JZ Series Concrete Mixer segment blocks , the maximum depth of 25.2 m segment , the minimum depth of 2.4 meters , stacked structure is loose, unconsolidated force , overall poor bias is serious, long 22 hole design shed 38 meters pipe , tube and top tube into the hole shed jobs extremely difficult using conventional drilling rigs , pipe roof construction quality and progress can not meet the requirements.

没有评论:

发表评论