2013年7月29日星期一

Concrete pump pipe

Concrete pipes, should be based on engineering and construction site characteristics, pouring concrete program for piping. Should shorten the length of the pipeline, less elbow and hose. Cement silo should ensure safe construction, easy to clean pipes, troubleshooting and disassembly repair.
In the same line, you should use the same diameter concrete pipes; together with the new, the 1st pipe, should a new tube arranged in the pressure at the pump; pipeline should be arranged smooth vertical and horizontal. Should draw piping diagrams, lists the various pipe fittings, concrete block machine, pipe and other specifications and quantity presented spare parts list. Concrete pipes should be based on the maximum size of coarse aggregate, concrete pump model, concrete output conveying distance, as well as transportation to choose the degree of difficulty. Pumping duct should be adapted to the conditions and the strength. Should be used no cracks, no bump damage and not bent pipe section. Duct joints should be tight, there is enough strength and capable of rapid assembly and disassembly. Minimum diameter of lOOmm duct, the maximum size of coarse aggregate not exceed 25mm, the minimum diameter of 125mm, the maximum particle size must not exceed 40mm.

没有评论:

发表评论