Procedure:
1, the column on the function toggle switch to position "Auto" position, press Start switch on the controller, the entire program will run automatically control their own Operation.
2, the whole process has concrete block machine automatically stop running the project for the Transit stop, press the stop button can then be restarted.
3, press the start button, the display shows the start time, slow,Sand, fast, stop, fast, running lights shining on time.
4, automatic control, you must put all the manual functions appropriated stop switch Position.
Operational considerations:
1, detected by measuring the regulation blade and the concrete mixing machine the pot wall shall 3mm ± 2mm, If the gap tolerance, the vertical position of the blade can be adjusted to achieve the specified range Wai.
2, stirring after each use leaf, pot should be clean, Electrical Division Points should avoid strenuous vibration, away from water and heat, pay attention to dust.
Know the mixer to use, in order to better improve project efficiency.