Check the position of the material on the conveyor


Check the head, tail rack bearing two plane deviation. If the deviation is greater than two planes 1mm, the response to adjustment of the two planes in the same plane. Head drum adjustment method: Concrete mixing plant side of the drum belt deviation, the roller bearing right or left should move forward bearing backward; if the conveyor belt deviation to the left of the drum, then roller bearing should be left or right to move steel cement silo after the shift. Rear roller adjustment method and the head drum opposite.
Check the position of the material on the conveyor. Material in the conveyor belt is not centered on the cross-section will cause belt deviation.