mixing station civilized construction accountability


1, Concrete mixer every day after work must arrange for cleaning of the site, the concrete residue eradicate station and sprinkler dust, cleaning after reported webmaster acceptance. 2, prohibits non-mixing station operating room operating personnel from entering the interior kept clean and tidy. 3, mixing station control room personnel must be cut off after work, power and concrete mixing machine, shut doors and windows, in order to ensure the safety of indoors, but also can reduce dust floated into the room. 4, mixing station after specimen production station, clean the residual concrete. 5, aggregate warehouse cleaning must arrange 24 hours in order to maintain warehouse clean, timely aggregate subballast to clear, warehouses often sprinkling dust.