Process: Ingredients → mixed → transport → Feeding → forming → delivery → stacking → Maintenance → finished.
Process Description: Asphalt Mixing Plant are placed according to the ratio feeder hopper by elevator to the wheel rolling machine rolling mixer stir stirring for a certain time, open the discharge gate, the mixing good material through belt conveyor transported to the top of the silo feeder, belt conveyor head pulley with permanent magnet material can be separated from the iron to avoid damaging the brick. Feeder to feed feeding PRESS mold hole, brick machine from 1800 to 2000 per hour concrete batching plant . while picking up the level of the car by hand, transported to the storage site for nature conservation brick, the brick no gap between the display, stack height of 12 layers, water Nature Conservancy 10-15 days, 28 days is the finished product.