Concrete mixing plant concrete mixing plant mainly by the mixing console, material weighing system, material handling systems, material storage systems and control systems and other five major system components and other ancillary facilities.
2013年8月30日星期五
Solenoid circuit fault and fault types
If the solenoid pilot valve inlet, sludge and other vent is clogged, closed lax plunger is stuck, circuit failure, can lead to valve can not be normal commutation. The former three cases should be cleaned on the core activities of the pilot valve and the sludge and impurities. Cement silo failures are generally divided into the solenoid control circuit faults and fault types. After checking circuit fault, should first manual valve knob a few turns to see the rated pressure valve is working correctly for commutation, if normal commutation, then the circuit is faulty. Inspection, the available instrument measuring the voltage of the solenoid, to see whether the rated voltage, if the voltage is too low, should further examine the power control circuit and the concrete block making machine circuit. If the valve is not properly rated voltage commutation, you should check the solenoid connector (plug) is loose or exposure is not true. Method is to unplug it, measure coil resistance (should generally be in the hundreds of ohms to several thousand ohms), if the resistance is too large or too small, indicating that the electromagnetic coil is damaged and should be replaced.
订阅:
博文评论 (Atom)
没有评论:
发表评论