brick installation commissioning


1, Asphalt Mixing Plant should be installed on a level concrete foundation with anchor bolts.
2, the installation should pay attention to the vertical and horizontal main body.
3, after the installation check for loose bolts and concrete block machine the doors hosts are tightened, if requested to tighten.
4, according to the device configuration of power supply lines and control switches.
5, the inspection is completed, the empty load test, test the normal production.